
Azure Landing Zone Setup
Structured Azure environment following Cloud Adoption Framework. Management groups, governance, networking, and security — the foundation for all Azure projects.
No Azure Project Stands Secure Without a Foundation
Most mid-market companies start with Azure like a blank slate: one subscription, a few VMs, no plan. Wild-growth environments quickly emerge: uncontrolled subscriptions, missing network isolation, no policy compliance, and costs nobody can attribute.
Every subsequent project — VDI migration, backup, AI workloads — suffers from the missing foundation. Retrofitting costs multiples more. Traditional landing zone implementations by system integrators cost EUR 50,000-250,000 and take 4-12 weeks.
With the “Start Small and Expand” approach following Microsoft's Cloud Adoption Framework, you build a solid foundation in 3 weeks — one that grows with your organization.
ACTIVITIES IN DETAIL
DELIVERABLES
Design management group hierarchy: Platform (Management, Connectivity, Identity, Security) + Landing Zones (Corp, Online) + Sandboxes
Set up dedicated subscriptions for Connectivity, Management, Identity, and Security
Hub-and-spoke network topology: Azure Firewall, VPN Gateway, Private DNS Zones
Assign Azure Policy initiatives: tags, diagnostics, allowed locations, compliance standards
Identity concept: RBAC at subscription level, PIM for privileged roles
Central logging infrastructure: Log Analytics Workspace + diagnostic settings via policy
IaC deployment with Bicep/Terraform via ALZ Accelerator
Operations handover: subscription vending, policy updates, day-2 operations guide
Design management group hierarchy: Platform (Management, Connectivity, Identity, Security) + Landing Zones (Corp, Online) + Sandboxes
Set up dedicated subscriptions for Connectivity, Management, Identity, and Security
Hub-and-spoke network topology: Azure Firewall, VPN Gateway, Private DNS Zones
Assign Azure Policy initiatives: tags, diagnostics, allowed locations, compliance standards
Identity concept: RBAC at subscription level, PIM for privileged roles
Central logging infrastructure: Log Analytics Workspace + diagnostic settings via policy
IaC deployment with Bicep/Terraform via ALZ Accelerator
Operations handover: subscription vending, policy updates, day-2 operations guide
Landing Zone Architecture: Documented design with management groups, subscriptions, and network topology
IaC Deployment: Bicep/Terraform code for the entire landing zone — versioned and reproducible
Governance Framework: Azure Policies, tagging standards, and compliance initiatives — deployed
Network Configuration: Hub-and-spoke with firewall, VPN gateway, and DNS — fully configured
Operations Handbook: Guide for subscription vending, policy updates, and day-2 operations
Complete Project Documentation: All architecture and configuration decisions documented without gaps
3 steps. From start to finished project
How a typical Microsoft project runs with DAMALO
STEP 1
Choose a blueprint and analyze your environment
Select a proven blueprint. AI agents pull your licenses, current config, and compliance needs into the plan. No generic advice.
STEP 2
Receive your plan and start implementation
Review the plan. AI agents draft architecture, sequence tasks, and map dependencies to Microsoft best practices. Tailored to your tenant.
STEP 3
Guided implementation through to completion
Execute step by step. AI agents provide PowerShell scripts, admin center deep-links, and walkthroughs. Every change auto-documented.
The result: A completed Microsoft project in 1-2 weeks. Documented. Audit-ready. Understood by your team. Adjustable at any time. No change requests. No follow-up engagements.
Next steps after Azure Landing Zone Setup
A cleanly configured tenant is the foundation. These blueprints build directly on it


